Here are the Crossrail information papers initially presented to the House of Commons Select Committee considering the Crossrail Bill in January 2006. Most of the papers have since been revised (the version number and date is shown on the bottom of the first page of the paper), and they are subject to revision as the Bill continues its passage through Parliament. In two instances, information papers are accompanied by technical notes. Where that is the case (D9 and D26), it is noted in the relevant information paper and copies can be made available on request.For a list of the commitments contained in the papers, please see the Register of Undertakings and Assurances (link on the left).
A Series — Route Development
A1 Development of the Crossrail Route
A2 Service Pattern
A3 Capacity on the Great Western Main Line
A4 Ventilation and Intervention Shafts
A5 Abbey Wood to Ebbsfleet
A6 Selection of Western Termini
A7 Selection of the North Eastern terminus
A8 Update on the Crossrail Project and Guide to the Environmental Statement
A8 Central Key Plan
A8 Western Key Plan
A8 North Eastern Key Plan
A8 South Eastern Key Plan
A8 Remote Locations Key Plan
B Series — Crossrail Bill Powers
B1 Disapplication of Legislation
B2 Limits of Deviation
B3 Compliance with Undertakings and Assurances
B4 Acquisition of Land Outside the Limits of Deviation
B5 Main Provisions of the Planning Regime
B6 Time Limits
B7 Bill as Amended in Select Committee in the House of Commons
B8 Compliance with the EIA Directive and ECHR
C Series — Property & Compensation
C1 Information for Property Owners
C2 Operation of the National Compensation Code
C3 Advance Claims Under Part 1 of the Land Compensation Act 1973 - SUPERSEDED – SEE C2
C4 Small Claims Scheme
C5 Additional Safeguarding
C6 Recovery of Costs by Property Owners
C7 Access to Residential and Commercial Property During Construction
C8 Purchase of Property in Cases of Hardship
C9 Land Acquisition Policy
C10 Land Disposal Policy
C11 Claims for Compensation for Intensification of Use
D Series — Construction & Environment
D1 Crossrail Construction Code
D2 Control of Environmental Impacts
D3 Excavated Material and Waste Management Strategy
D4 Treatment of Contaminated Land
D5 Site Reinstatement
D6 Construction Traffic
D7 Maintenance of Public Utilities
D8 Tunnel Construction Methodology
D9 Noise and Vibration Mitigation Scheme
D10 Groundborne Noise and Vibration
D11 24-Hour Working
D12 Ground Settlement
D13 Restitution of Open Space
D14 Worksite Security
D15 Implementation and Staging
D16 Use of Local Labour
D17 Ecological Impacts
D18 Listed Buildings and Conservation Areas
D19 Highways and Traffic During Construction — Legislative Provisions
D20 Traffic Management During Construction
D21 Access for People with Restricted Mobility During Construction
D22 Archaeology
D23 Sprayed Concrete Lining
D24 Tunnelling Duration and Construction Strategy
D25 Noise from Fixed Installations
D26 Surface Railway Noise and Vibration
E Series — Operations
E1 Passenger Car Parking
E2 Cycle Carriage and Cycle Parking
E3 Retail Space
E4 Public Safety, Security and Crime Prevention
E5 Provisions for People with Reduced Mobility
E6 Freight Operations
F Series — Consultation
F1 Inclusivity
F2 Pre-Bill Consultation Process
F3 Community Relations
F4 High Level Forum
F5 Complaints Commissioner
G Series — Site Specific
G1 Romford Depot — Facilities and Construction SUPERSEDED – SEE G5
G2 Heathrow Access and Stockley Flyover
G3 Location of Hanbury Street Shaft
G4 Tottenham Court Road — 94 Dean Street
G5 Revised Depot and Stabling Strategy
G6 London 2012 Olympic Games and Crossrail
H Series — Rail Industry Issues
H1 Timetabling & Growth
H2 Railway Compensation
H3 Crossrail Access Option
H4 Railway Powers in the Crossrail Bill