Departures BoardTwo people pulling cases on wheelsTrolley coin security slots
 

    Home >

Draft Environmental Minimum Requirements (Including Draft Construction Code)

Draft Environmental Minimum Requirements

Crossrail has published an update of the draft Environmental Minimum Requirements.

The construction of Crossrail will be governed by the Environmental Minimum Requirements and comprises:

1. General Principles.
2. The Construction Code.
3. The Planning & Heritage Memorandum.
4. The Environmental Memorandum.

This will provide controls which contractors and others working to build the railway will work under and is being developed by Cross London Rail Links with the Local Authorities and Statutory Agencies. It will be finalised before the Crossrail Bill receives Royal Assent.

For further information contact the Crossrail 24 hour seven day a week helpdesk on 0845 602 3813 or e-mail helpdesk@crossrail.co.uk


File Downloads


Adobe Acrobat icon  Environmental Minimum Requirements - Draft 3.0.pdf (57.3K)

Adobe Acrobat icon  EMR Annex 1- Construction Code - Draft 4.0.pdf (527.6K)

Adobe Acrobat icon  EMR Annex 2 - Planning Memorandum - Draft 4.0.pdf (136.9K)

Adobe Acrobat icon  EMR Annex 3 - Environmental Memorandum Draft 5.0.pdf (171.3K)



No documents found